• Badin
  • Dadu
  • Ghotki
  • Hyderabad
  • Jacobabad
  • Karachi
  • Khairpur
  • Larkana
  • Mirpurkhas
  • Mithi
  • Nawabshah
  • Nferoze
  • Sanghar
  • Shikarpur
  • Sukkur
  • Thatta
  • بدین
  • جیکباباد
  • حیدراباد
  • خیرپور
  • دادو
  • سانگر
  • سکھر
  • شیکارپور
  • لارکانا
  • مٹھی
  • میرپوخاص
  • نوابشاھ
  • نوشھروفیروز
  • ٹھٹہ
  • کراچی
  • گوٹکی
  • بدین
  • جیکباباد
  • حیدراباد
  • خیرپور
  • دادو
  • سانگر
  • سکھر
  • شیکارپور
  • لارکانا
  • مٹھی
  • میرپوخاص
  • نوابشاھ
  • نوشھروفیروز
  • ٹھٹہ
  • کراچی
  • گوٹکی

Revised License Fees
Govt of Sindh, Agriculture Department Karachi, has revised the License Fees vide notification# SO (PMP)/5(377)/2006 click here

Revised Market Fees
Govt of Sindh, Agriculture Department Karachi, has revised the Market Fees vide notification# SO (PMP)/5(377)/2006 click here

Recovery of Market Fee
Govt of Sindh Agri Dept, Karachi has decided to recover the market fee through deposit of payment via bank challan instead of cash payment, therefore all concerns please desposits the payments into bank through challan.

The Sindh Wholesale Agricultural Produce Markets (Development & Regulation) Act 2010
Now private sector can open new market in Sindh. The existing notified markets will transfer to limited company.

Free Counter
Free Counter

ADB Assisted Schemes

Agriculture Marketing on-going Schemes
Progress Report for the month of February 2011

Available Reports
2010 March | April | September
ADP
SR
Name of Scheme / Market Scope of Physical Works Achievements
42 Development of Internal Road Water supply drainage and other modern facilities and liblities of KESC in sabzi Mandi Karachi

 

Constn. of int. sewerage line and 3000 rft External nala 100% work Completed
Constn. of C.C. Road. 50% work completed
Laying of 36" dia AXTC pipe for main disposal. Completed
Constn. of heavy rain pump 12*12 motor.house 50% work completed
Open rain lock (pen stock gate) ---
P/L J.testing 8" dia MS pipe line 95 % work completed
P/L J.testing 3" dia GL pipe line WS 98% work completed
Re-constt: of foot paths 80% work completed
P/F Electric mask light 96%Completed
Constn. og open drain lock from side ---
12" & 9" internal sewerage line work completed
Desalting clean of Nala outside 95% completed
P/L J3" dia pipe line W/S (2nd part) 70% completed
Constn. of Road Drain 70% completed
43 Establishment of meat, Fish and Vegetable Market at Qasimabad, Hyderabad under PPP (Boundary wall)
Main Building  
Constt: of Boundary wall Compound wall work started, but held up due to dispute over plot
internal roads  
Water supply and sewerage line underground tank
 
Modern facilities  
Ext. Dev.  
Energization  
Suigas  
   
44 Establishment new Subzi Mandi/Cold storage at karachi (2 Nos), Mirpurkhas, Tando Allahyar and Shahpur jahania.

New Sabzi Mandi Northern Bye-Pass, Karachi

1/-Nothern By Pass

 
Compound wall Front & left side c/wall s/Strctr Col.in prog.
Int' Road

---

Water supply. ---
Drainage & other Modern Facilities & Libilities of KESC. work stopped due to non decided layout
U.G Tank 80% Completed
   
  Ghaghar Pathak, Karachi
2/-Ghaghar Pathak Black masonary above pilnth in prog
Compound wall progress
Int'l Road ---
Water supply. ---
Drainage & other Modern Facilities & Libilities of KESC. work stopped due to non decided layout
U.G Tank 2 lacs gallon 70% Completed
   
  Mirpurkhas.
Cold storage in Existing Godown colouring in Progress
Plate Form Completed
C/Wall  
Main Gate 2 Nos.  
Internal Road / Earth Filling Completed
Freezing plant Connection remain D/note of wining service wire not received
Ext. Electric Services ---
D.Note for WAPDA Transformer Purchase
Open Surface drain ---
   
  Tando Allahyar
Godown / Storages Finishing in Progress.
Plat Form  
Constt: of Internal roads. Work in Progress
Earth filling Work in Progress
U/G tank (20000 gl) / HSR (10000) Work in Progress
Ext. Electric Services Work in Progress
Freezing Plant Work in Progress
D.Note for WAPDA Paid
Pump room / open surface drain ---
   
  Shahpur Jehanya
Estt: of cold storages (Main bldgs) Finishing in Progress.
Compound Wall Completed
Constt: of Main gates 2 Nos  
Constt: of carparking shed  
constt: Int: roads  
Ext: E.I etc.  
Cost of Land Paid Rs. 1.2 (M) cost of land.
  Construction of Mirchi Mandi at Kunri (District Umerkot)  


 
 
 

©
Copyright 2010 Sindh Agriculture Marketing System. All rights reserved.
Website Developed and Managed by: GEXTON